Chesapeake Bay Bridge Inspections

MARLIN performed a hands-on inspection of suspension cables for Eastbound and Westbound bridges of Maryland’s major dual span bridge – Chesapeake Bay Bridge. Cable casing, stanchions, and saddles were inspected for leaks and deficiencies. Florida Drawbridges, Inc. (FDI) required a soap solution inspection process to locate any leaks of the dehumidifier system throughout the entire cable system.

Coordination was essential for the success of this project as the time window was relatively short due to traffic requirements and weather constraints affecting climbing operations. Additionally, project deliverables included inspection and report documentation with accompanying photographs and/or video of deficient areas.

CLIENT

Florida’s Drawbridges, Inc.

WHAT WE DID

Infrastructure Operations & Maintenance

Success Factors

Key factors attributed to the success of this project included MARLIN’s expertise in climbing structures of all types, and our strong relationship with FDI built on a foundation of safety, communication, and past projects delivered on time and without incident.

Related Projects
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, as soon as possible.

Not readable? Change text.

Start typing and press Enter to search