NEXT>>>

Surveying Projects:

NW 25th Street from NW 89th Court to NW 67th Avenue, Miami, Florida
2.2 mile, Florida DOT project requiring horizontal and vertical control verification / establishment, topography, Digital Terrain Models, Static and RTK GPS, canal soundings, layout / locate bore sites. Performed 800 subsurface utility exploration and utility coordination with 40 utility companies.

City of Miami Drainage Improvement Program, Miami, Florida
Approximately 4 miles of suburban roadway requiring topography, horizontal and vertical control, recover / reset city monuments as needed.

 

 

Corporate Headquarters • 2191 N.W. 97th Avenue • Miami, Florida 33172-2313 • Tel: 305-477-7575
For more information contact us at
mei@marlinengineering.com

| Home | The Firm | Contact Us | Links |
| Transportation Planning | Traffic Engineering | Roadway Design |Bridge Inspection |Surveying/Utilities |Municipal |Construction Management/CEI |