US 1 from I-95 to SW 88th Street Corridor Study

The Florida Department of Transportation (FDOT) District 6, is conducting a corridor study along US 1 from Vizcaya Metrorail Station to Dadeland South/SW 88th Street. The corridor study will analyze existing conditions, identify recurring congestion locations; and evaluate multimodal transportation improvement needs based on future travel demand. Finally, the study will identify conceptual improvements for congested locations along the US 1 corridor and provide recommendations for subsequent detailed studies.

MARLIN’s role in this study included existing conditions analysis of multimodal traffic data collection, on-board Metrorail and bus ridership data collection, transit speed and delay analysis freight analysis, and a detailed analysis of pedestrian, bicycle access to, and connectivity within, Metrorail Stations and their park and ride lot facilities.

A list of projects was developed for each station based on field observations, utilization data, pedestrian and bicycle counts, and the FDOT 2016 Park and Ride Lot Inspection report. A total of 76 projects were identified as improvements focused. MARLIN provided instrumental input of funding strategies and categorizing projects to fit into the FDOT Work Program.

Project Information

Location

Miami-Dade County, Florida

Client

Florida Department of Transportation | District 6

Services

Traffic Engineering
Transportation Planning

Similar Projects

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search