The Underline Non-Motorized Overpass
MARLIN created a conceptual and feasibility analysis to identify, evaluate and recommend potential alignments for a non-motorized overpass to complement the proposed Underline, the country’s longest under-rail linear park.
The feasibility study included:
- Field review of existing conditions
- Analysis of existing Right of Way Maps and Survey
- Horizontal and vertical geometric analysis
- Coordination with local companies that manufacture pre-fabricated bridges to obtain preliminary cost estimates and engineering specifications
- A conceptual Right of Way cost analysis of the adjacent properties within the study area
- Development of design criteria
- Development of concept alternatives including typical section, plan and profile
- Preparation of preliminary cost estimates