The Underline Non-Motorized Overpass

MARLIN created a conceptual and feasibility analysis to identify, evaluate and recommend potential alignments for a non-motorized overpass to complement the proposed Underline, the country’s longest under-rail linear park.

The feasibility study included:

  • Field review of existing conditions
  • Analysis of existing Right of Way Maps and Survey
  • Horizontal and vertical geometric analysis
  • Coordination with local companies that manufacture pre-fabricated bridges to obtain preliminary cost estimates and engineering specifications
  • A conceptual Right of Way cost analysis of the adjacent properties within the study area
  • Development of design criteria
  • Development of concept alternatives including typical section, plan and profile

Client

Florida Department of Transportation | District 6

What we did

Design, Survey

Related Projects
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search