Port St. Lucie Boulevard Travel Time & Delay Study

Evaluation of the performance of Port St. Lucie Boulevard along nine intersections, from the I-95 northbound off/on ramp terminal intersection to the Bayshore Boulevard intersection. The corridor length encompassing these nine signalized intersections is 2.8 miles. The goal of the study is to evaluate the efficiency of this transportation corridor before and after the adaptive signal system (Rhythm Engineering InSync) improvements were made to the signals along Port St. Lucie Boulevard.

The evaluation is conducted at three different times to establish a good comparison and assessment:

  • During the Summer
  • Shortly After the Beginning of the School Year
  • At Peak Season in January
Project Information

Location

Port St. Lucie, Florida

Client

City of Port St. Lucie

Services

Traffic Engineering

Similar Projects

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt

Start typing and press Enter to search